74 McKellar Way Epping

  • Total Site Area
    15,690 sqm*
  • Floor Plates - office
    322.80 sqm*
  • Floor Plates - warehouse
    8,495 sqm*
  • Total Tenancies
    1
  • Completed
    September 2022

Features

    • Built for purpose cold storage facility with multiple freezer compartments
    • Architecturally designed for semi-trailer access with loading dock to suit multiple trucks
    • Construction completed with precast concrete shell and freezer panel interior

About The Project

Built over a 15,690 sqm site – 74 McKellar Way, Epping is a fit for purpose cold storage facility with a modern architecturally designed office.

The first stage of this project is built over a 9 month period and includes the construction of four fire-separated freezer compartments including all refrigeration services, a loading dock which can service up to 7 trucks at a time, a 2-storey office and all the essential services required for a fully operational building.

The site is constructed to take into consideration semi-trailer access, ample car parking, security and landscaping.